Unverified Commit 232674e1 authored by Pierre-Eric Pelloux-Prayer's avatar Pierre-Eric Pelloux-Prayer Committed by Maxime Ripard
Browse files

drm/sched: Fix racy access to drm_sched_entity.dependency



The drm_sched_job_unschedulable trace point can access
entity->dependency after it was cleared by the callback
installed in drm_sched_entity_add_dependency_cb, causing:

BUG: kernel NULL pointer dereference, address: 0000000000000020
[...]
Workqueue: comp_1.1.0 drm_sched_run_job_work [gpu_sched]
RIP: 0010:trace_event_raw_event_drm_sched_job_unschedulable+0x70/0xd0 [gpu_sched]

To fix this we either need to keep a reference to the fence before
setting up the callbacks, or move the trace_drm_sched_job_unschedulable
calls into drm_sched_entity_add_dependency_cb where they can be
done earlier.

Fixes: 76d97c87 ("drm/sched: Trace dependencies for GPU jobs")

Signed-off-by: default avatarPierre-Eric Pelloux-Prayer <pierre-eric.pelloux-prayer@amd.com>
Reviewed-by: default avatarTvrtko Ursulin <tvrtko.ursulin@igalia.com>
Signed-off-by: default avatarPhilipp Stanner <phasta@kernel.org>
Link: https://lore.kernel.org/r/20250901124032.1955-1-pierre-eric.pelloux-prayer@amd.com


(cherry picked from commit b2b8af21)
Signed-off-by: default avatarMaxime Ripard <mripard@kernel.org>
parent 69a79ada
Loading
Loading
Loading
Loading
+7 −4
Original line number Diff line number Diff line
@@ -391,7 +391,8 @@ EXPORT_SYMBOL(drm_sched_entity_set_priority);
 * Add a callback to the current dependency of the entity to wake up the
 * scheduler when the entity becomes available.
 */
static bool drm_sched_entity_add_dependency_cb(struct drm_sched_entity *entity)
static bool drm_sched_entity_add_dependency_cb(struct drm_sched_entity *entity,
					       struct drm_sched_job *sched_job)
{
	struct drm_gpu_scheduler *sched = entity->rq->sched;
	struct dma_fence *fence = entity->dependency;
@@ -421,6 +422,10 @@ static bool drm_sched_entity_add_dependency_cb(struct drm_sched_entity *entity)
		entity->dependency = fence;
	}

	if (trace_drm_sched_job_unschedulable_enabled() &&
	    !test_bit(DMA_FENCE_FLAG_SIGNALED_BIT, &entity->dependency->flags))
		trace_drm_sched_job_unschedulable(sched_job, entity->dependency);

	if (!dma_fence_add_callback(entity->dependency, &entity->cb,
				    drm_sched_entity_wakeup))
		return true;
@@ -461,11 +466,9 @@ struct drm_sched_job *drm_sched_entity_pop_job(struct drm_sched_entity *entity)

	while ((entity->dependency =
			drm_sched_job_dependency(sched_job, entity))) {
		if (drm_sched_entity_add_dependency_cb(entity)) {
			trace_drm_sched_job_unschedulable(sched_job, entity->dependency);
		if (drm_sched_entity_add_dependency_cb(entity, sched_job))
			return NULL;
	}
	}

	/* skip jobs from entity that marked guilty */
	if (entity->guilty && atomic_read(entity->guilty))